Abstract
As the connections of variable energy resources (VER) to the distribution system are recently delayed due to the limited expansion of the network facilities, the accurate calculation of the hosting capacity for VER has become an issue in the distribution system. The utilities would decide to integrate additional VER in a similar way as they have done for the conventional distributed resources. However, this method can be too conservative for VER. The capacity factors of VER are usually low due to their dependency on the weather and the correlation with the electric loads is quite high. Therefore, the criteria for allowing those connection should be based on the probable operating conditions rather than the maximum output based operation condition. For doing this, this paper proposes the method of calculating the capacity of the distribution system for hosting VER considering the probable operating conditions based on the time-series based operation simulation.
| Original language | English |
|---|---|
| Pages (from-to) | 9-15 |
| Number of pages | 7 |
| Journal | Transactions of the Korean Institute of Electrical Engineers |
| Volume | 69 |
| Issue number | 1 |
| DOIs | |
| State | Published - 2020 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 7 Affordable and Clean Energy
Keywords
- Distribution System
- Hosting Capacity
- Renewable Energy Source
- Variable Energy Resource
Quacquarelli Symonds(QS) Subject Topics
- Engineering - Electrical & Electronic
- Engineering - Petroleum
Fingerprint
Dive into the research topics of 'Hosting capacity calculation method for variable energy resources based on the operation simulation of distribution system'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver