Abstract
The ultra-high vacuum system of the PLS electron storage ring was successfully commissioned in July 1995. Since then, it routinely provides a dynamic pressure of about 7×10-10 Torr. The measured beam lifetime is more than 10 hours with 100 mA beam at 2 GeV. The rapid recovery of normal operation after installation of new components is achieved without in-situ bakeout by using a dry venting system. We present operation experiences with the NEG pumps and the performance of the vacuum system.
| Original language | English |
|---|---|
| Pages | 3633-3635 |
| Number of pages | 3 |
| State | Published - 1998 |
| Event | Proceedings of the 1997 17th Particle Accelerator Conference, PAC-97 - Vancouver, BC, CAN Duration: 1997.05.12 → 1997.05.16 |
Conference
| Conference | Proceedings of the 1997 17th Particle Accelerator Conference, PAC-97 |
|---|---|
| City | Vancouver, BC, CAN |
| Period | 97.05.12 → 97.05.16 |
Fingerprint
Dive into the research topics of 'Operation experiences for PLS vacuum system'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver